Example study · Real estate development

What would this parcel yield? Know before you bid.

Bring the parcel, or a pipeline of them. You get each lot read (area, zone, max FAR and the FAR already built), massing options tested on the real site, and a yield sheet for your deal file.

Building Gen v2 on a real Los Angeles lot: its zoning and FAR, and ten massing options
Still from AURA ENGINEImagery © Google
The study

How we work alongside you

  1. We read the lot: area, zone, max FAR and the FAR already built.
  2. We test your program: housing, mixed use or office.
  3. We generate massing options on the real site, each with storeys and gross floor area.
  4. Our analysts check the zoning behind each option against the code.
  5. We hand over the yield sheet and walk your acquisitions team through it.

What you get

  • Lot area, zone, max FAR and the FAR already built, with sources.
  • Massing options with storeys and gross floor area.
  • A one-page PDF and a CSV of the lot and its options.

Scope

  • An early yield screen, not a feasibility study.
  • Zoning is read for Los Angeles, New York City and Santa Monica today, and our team checks it against the code.

Have a parcel in mind?

Send it to us and we’ll reply with how we would screen it. Fixed scope and a fixed fee, agreed before we start. Want to try the engine yourself first? It’s in open beta.

Tell us about your project